How to connect DHIS2 to Microsoft Power BI | A Step by Step Guide

Yes, you know about DHIS2 and Power BI. You’ve heard they work well together—but hit roadblocks when integrating them? :construction::bar_chart:

You’re not alone. Even experienced analysts run into challenges. Here’s a step-by-step guide to making it work! :thread::point_down:

:link: Read more here:

analytics powerbi dhis2 learning

8 Likes

This is very useful.Thank you

2 Likes

Thank you for your feedback @Stanley. I am looking forward to seeing what you are doing with this feature.

1 Like

Hi @Mayamiko
Is this method of using the DHIS2-to-Power BI connector now working for the latest DHIS2 versions starting from 2.38? Previously, I noticed it only worked for older DHIS2 versions.

2 Likes

Hi @Shapr0019. This method still works. One thing I noticed was that you would need to adjust the end date to get the required data. I mentioned more about this here:

1 Like

@Mayamiko Thank you very much, let me also try it . Also consider to update this part “Compatible with DHIS2 2.29–2.32.”

1 Like

To make sure I understand, where exactly should I update this?


@Mayamiko I was referring to the DHIS2–Power BI connector on the DHIS2 App Hub. Please see the image.

2 Likes

Oh I see. That is something that would been to be edited by the BAO Systems team in the DHIS2 App Hub.

1 Like