Hi all!
I don’t know if my issue is related to this (Overdue events in android capture app?), but when I register an TEI all of them comes with red calendar as you can see on the screenshot. I am using tracker app version 2.8.2 conected with dhis2 version 2.39.5.
Thank you
Hi @cassamo Sorry for the issues you are experimenting.
I have been able to replicate the error you mention in the android capture app version you are using, it is fixed from 2.9.1.1 onwards as we redesigned the TEI list screen, so the only solution we can provide is to update to the latest version, As we don’t support old versions, the only frozen version we currently maintain is 2.9.1.1 However, I would suggest updating to the latest if possible.
Regards,
Xavier
Thank you for your answer @Xavi.
I tested the version you recommended, 2.9.1.1, and I continue to face the same problem, as you can see in one of the attached images labeled ‘Today.’
When selecting a Program Stage for data entry, I must first enter the report date and the due date, which by default comes with the Enrollment date.
See the program stage configuration in one of the images
Hi again @cassamo I have double checked this and it is indeed a bug, the today tag is correct but the icon should be
I have created a Jira issue so you can track the progress here:
https://dhis2.atlassian.net/browse/ANDROAPP-6480
Thank you for bringing this to our attention.
Kind regards.
Xavi